All content copyright, Creative Commons Attribution-Noncommercial-Share Alike 3.0
Unported, with the attribution: "The Lead CRA Blog", and a link to the post.

Showing posts with label monitoring plan. Show all posts
Showing posts with label monitoring plan. Show all posts

Thursday, August 11, 2011

Lead CRA Q&A: Meeting with a Principal Investigator

Anonymous commented in... "Routine Monitoring Visits":
Could you please give advice about how to deal with the "difficult" Principal Investigator who doesn't want to meet you despite the numerous efforts to persuade him? Any recommendation would be very appreciated! -May 26, 2011 2:54 PM


NadiaBoBadia responds...
Thank you for a great question.  I've partially addressed it before in a post from the archives called "Who's Running this Study?"  Even though Principal Investigators (PI) have made a commitment to personally oversee the safety and conduct of the trial (In the US, see FAQ for FDA Form 1572) they often can't find time to actually meet with the monitors during our visits.  This happens quite often so I definitely want to address your question.  Remember, that there is no regulatory mandate that we talk to the PI but certainly it is a best practice.  However, I don't want to understate the importance of regularly briefing with the PI.  Remember from my post on Routine Monitoring Visits that the PI discussion is an opportunity to address important topics that affect conduct, can positively impact data reliability and validity, and ensure vigilance in reviewing ongoing subject safety.  If your trial is still recruiting, meeting with the PI can be instrumental in influencing study enrollment (related post).

My interest when I am monitoring is to meet all of my objectives as efficiently as possible and leave the site as soon as I have met my goals.  Guess what though, doctors are busy.  In turn, I offer my PIs flexibility where I can.  I do not insist that they drop everything and meet with me each visit.  Generally, I have more success when I schedule an appointment time (say 15-30 minutes) in my confirmation letter and confirm it a few days before arriving.  If the PI truly can't meet though, a telephone contact within 10 days of the visit will be an effective alternative for communicating important findings during the visit, pending items for resolution, or general study updates or training.  I document the call in my report, in a separate telephone contact report for the TMF, and/or an email recap.

Trick your PI into a meeting! Tell the
doctor there is a party they must attend and then tackle
them with your visit findings - just kidding!

Part of our goals as monitors are to prepare PIs for audits and also to influence operations of a trial.  We help bring corrective action for any missed procedures and help them document anything that may need to support the record of conduct down the road.  We help them defend their data and demonstrate that patient safety is protected.  The PI meeting furthers these goals so it is important to budget time for it.  Don't use the meeting just to criticize the "difficult" PI and the study site staff.  Give them kudos and tell them what is going well and also where improvements may be needed.

If you pitch the PI meeting like this, act accordingly, and are respectful of the PI's time then the meetings are more productive and more likely to occur.  As you build a relationship with your PIs, they will see that you are committed to helping them conduct the trial properly.  As your PIs grow to trust you as a partner to their site, they are more likely to make time to meet with you.


Reader questions may have been edited for spelling or grammar, for reasons of anonymity, truncated, or edited in other ways although the main content remains unchanged.



You may also like...from The Lead CRA archives:

Sunday, August 3, 2008

Efficiency Tips: Spend less time on your Timesheet

I am employed by a service company and we bill our clients for our services. Therefore, we must track our time spent on sponsor related work and pass the costs through appropriately. I am asked to track my time in 15 minute increments so I can basically report up to 4 time categories per hour or I can bill a half or whole hour to a specific time code. In order to receive a good performance rating, I must report at least 85% of my 40 hr work week as "billable time".

My non-billable time codes are things like: Sick, Holiday, General and Administrative Duties (G&A), Internal training (not project specific), goofing off (ok, so that is not a category but if ever I am shy of 40 hrs and can't account for the time then G&A is a good catch all), etc.

Billable time is coded by project (since I might work for several sponsors/projects at once) and then broken down into time categories as follows:
Project Specific Training / Sponsor Teleconferences - Reading protocols, watching power points, reviewing the Monitoring Plan, etc.
Preparing and Following Up - This category is used for making travel arrangements or writing confirmation/follow-up letters, or working on reports.
Traveling - Usually your project will have limits to how much travel time you are allowed to pass through. At my company, when long trips are unavoidable, you can lower your travel time by using the time in transit to complete other project related work such as studying or writing reports (billable to either of the 2 categories listed above) - obviously this works when on an airplane or delayed and not necessarily when driving!
Managing Sites - This is phone or email contacts to your study sites or running special project specific reports.
Conducting a Monitoring Visit - Actual time spent on site during SIV, COV, or routine MV.
Query/Database Management - Helping the site solve/close queries raised by data management, reviewing the clinical database, running reports, etc.
Expense Reporting - see my next post!

OK, so now that I explained how I categorize time, let me explain the time tracking system. You can think of it as a glorified version of Excel that lives on a web server. So to enter my time, I have to log into that system and enter all of my hours. We are asked to do this at the end of every day so we are as accurate as possible. Well, I don't have internet access all the time so sometimes I let a few days pass and it really is hard to remember what you did for the past 48-72 hours by 15 minute increments. To solve this conundrum, I made a copy of the fancy web-based timesheet template in Excel and I just leave it on my desktop. Each day before I log out of work, I update my time in my Excel template. Then every 2 weeks (or as I have time) I log into the web-based system and transfer it all. I know this is multiple steps but it seems to work better for me. You could also use a journal or jot notes about how you spent your time in your day planner. Any other tips?

Efficiency Tips: Spend less time on Monitoring Visit Reports

As a monitor, you may visit several different study sites in a single week and possibly for different protocols. I often find when I get home from a trip like that it is hard to write my report and keep the details of the different sites straight. One thing I have done to successfully overcome that is to draft my report before I even do the visit. On most studies, your Lead will provide you with a template report that you will need to complete following each visit type. You might also use an electronic system to create your reports but luckily, mine are usually just MS Word templates. Every report is guaranteed to have a header section that includes the MD name, facility name and address, visit type, visit date, date of last visit, and list of attendees. You probably know all of this information before you step foot on the site so just fill it in before you go.

Things I am unsure about I highlight in yellow so I remember to return to them later. Unless this is your first visit to the site, chances are there is a previous report completed by either you or another CRA that has items that probably need to be carried over to your current report. You will want to refer to your company's SOPs and your project-specific monitoring plan to know which items get carried forward. On some of my recent reports, this has included Enrollment data (I can usually get the current number of Screened, Screen Failed, Enrolled, Early Term, and Completed subjects from the IVRS system before I even show up for the visit), summaries of Protocol Deviations to date (they stay on the report until the IRB acknowledges receipt of the deviation), SAEs that are not resolved, Regulatory Documents that need to be collected, and pending Action Items or those that have been resolved since the last report date.

Drafting your report before the visit has the added benefit of helping you write your confirmation letter and get a grasp on what activities need to take place during the visit. You will be organized before you get there and more likely to monitor efficiently if you know exactly what is outstanding.

While you are at the site, avoid keeping notes on notebook paper; just write pending items directly into the Action Items or other applicable section of your report. If the items you notes are resolved by the time you leave you may decide to dump them from your report (depending on how much detail your company/sponsor is looking for) and if not, mark them pending and submit them as part of your draft.

When I am at the airport waiting for my flight to board, I can usually knock off a draft report in about 20-30 minutes. Then when I have internet access, I just submit it and forget it (or at least until I get a revisions request)! What efficiency tips work for you?

Not getting any work done in the airport terminal?
Your company may reimburse you for airport lounge
access or you can typically get a discount pass through
loyalty to an airline or credit card offers.  In the lounge
you can be productive, enjoy snacks and beverages,
access the internet and a business center plus plug
in all of your devices.