Monday, April 16, 2012

Site Startup Series

Welcome to The Lead CRA Blog Site Startup Series.  This course of blog posts is designed to step you through the various activities of launching a clinical trial site.


What are the regulatory requirements before recruitment can begin? What are typical sponsor requirements? How do clinical trial sites even get chosen? These topics and more, demystified in the series below:
  • What are the typical milestones of site startup?
  • Metrics, trackers, reports, and dashboards
  • What is feasibility? How do sponsors choose which clinical trial sites they work with?
  • What is an essential document package and a regulatory submission?
  • Informed Consent Form templates
  • Why do contracts take so long? How are they complicated?
  • Site Budgets
  • IRB submissions
  • Calculating Investigational Product needs
  • Providing study supplies and source documents
  • Ensuring sites are adequately trained and prepared to participate
  • Developing Investigative Site Patient Recruitment Plans
  • What correspondence goes in the Trial Master File?
  • Gating tasks...bottlenecks
  • Lessons learned, where did the process breakdown?
  • How to speed up site startup?
Are there other questions or topics that you would like me to cover related to site startup? Please leave me a comment or drop me an email at leadcra-mail@yahoo.com.

Sunday, April 15, 2012

Thinking About Site Startup

I've been thinking a lot lately about how important it is to choose the right clinical trial sites for the success of your trial.  Just last week I blogged about the painful process and high costs of closing non-performing or under-performing sites.  I recently told a non-industry friend that it can take upwards of 18 months sometimes to usher a clinical site from selection to initiation.  He responded, "well that make sense since many clinical trials last several years and it takes a while to give the medication to enough patients to test it out thoroughly."  Then I realized he had misunderstood me, I clarified, "Initiation means the doors are open. At initiation, a doctor can start looking for patients.  I am telling you that it can take one year or more sometimes just to get a site open for recruitment to start the trial."  He was floored and responded, "no wonder we're paying so much for our prescriptions..."

I recently went to an ACRP seminar called 'Why Sites Fail in Study Startup'.  The dynamic speaker, Christine Pierre is the President of RxTrials Institute (RxTi) and gave a terrific talk.  If you would like to meet her or discuss this topic further, perhaps you would like to attend the Site Solutions Summit in October.  I haven't booked my travel yet but I am definitely considering going.

Early bird rates are available now!
I am excited to see the next-generatiion startup
tracker product when it is released. 
Then, a few days ago I traveled to downtown San Francisco, CA to visit the offices of goBalto. This innovative company has developed a web-based platform for Clinical Study Startup, Tracker™. The software "enables clinical trials sponsors to collaborate with multiple partners directly from the web in a transparent and regulatory compliant manner".  They invited me to a demo of their next generation product to participate in a user feedback session.  I was really impressed and found them to be extremely forward-thinking.  I am excited to see the product when it is released.

So, all of this has led me to develop a new series for the blog focusing on: Site Startup.  In addition to my work as a Lead CRA, I have been involved in clinical study site startup for a variety of pharmaceutical companies pretty much without interruption for the past 28 months.  Whoa, over 2 years you say?  "Surely, Nadia you must have tremendous experience launching study sites for many clinical trials in that time!"  Yeah, well uh, regrettably, no.  However, in that time I have worked with six disparate clinical operations teams and supported the process of opening a few hundred sites in five different countries (mostly Phase II trial sites).

As a regional monitor at a CRO, I would routinely assist with pre-study site selection visits and administration of feasibility questionnaires but the majority of my work was 85% regional monitoring and site management once sites were open.  Since I have moved to an in-house role, I spend a lot more time in the start-up side of things, buried in spreadsheets, trackers, dashboards, and demands from my boss and the board of directors, so I have gleaned some valuable insights. We'll be stepping through several broad topics of site startup in the coming weeks including:
  • What are the typical milestones of site startup?
  • What is feasibility? How do sponsors choose which clinical trial sites they work with?
  • What is an essential document package and a regulatory submission?
  • Informed Consent Form templates
  • Site Budgets
  • Why do contracts take so long? How are they complicated?
  • Developing Investigative Site Patient Recruitment Plans
  • IRB submissions
  • Calculating Investigational Product needs
  • Providing study supplies and source documents
  • Ensuring sites are adequately trained and prepared to participate
  • What correspondence goes in the Trial Master File?
  • Metrics, trackers, reports, and dashboards 
  • Gating tasks...bottlenecks
  • Lessons learned, where did the process breakdown?
  • How to speed up site startup?
What is missing from this list? Do you have other questions or topics that you would like me to cover related to site startup? Please leave me a comment or drop me an email at leadcra-mail@yahoo.com.

Saturday, January 14, 2012

Lead CRA Q&A: Consenting Subjects Before IMP is On-site

Anonymous commented in... "Pre-Study Visits and Site Initiation Visits":
Post SIV, can a site share the Informed Consent Form (ICF) with pre-identified subjects prior to Investigational Medicinal Product (IMP) receipt at the site? -November 26, 2010


NadiaBoBadia responds...


Hi and thanks for your question. In one of my previous trials, all of our sites consented and screened subjects prior to receipt of Investigational Product. First shipment was only triggered after a second qualifying screening visit (4 week screening window with up to 40% screen failure rate).
Investigational Medicinal Product can only
be released to a site once all of the required
regulatory paperwork is in place.

In order to consent, our SOP required that the site be authorized for drug shipment, rather than requiring that drug was actually physically on site. In order to authorize drug shipment the site must have 1) completed the SIV 2) received IRB approval for protocol, ICF, Investigator's Brochure (IB), and all PRO instruments 3) Submitted complete regulatory document package to sponsor (1572, signed/dated w/i 1 year CVs for all personnel on 1572, Financial disclosures, Protocol signature page, IB signature page, etc. (some of this package goes to the FDA before the trial is initiated at the site) 4) fully executed contract and budget 5) written activation letter from sponsor. At that point the sites were allowed to begin distributing ICFs for review and signature.

Reader questions may have been edited for spelling or grammar, for reasons of anonymity, truncated, or edited in other ways although the main content remains unchanged.

You may also like...from The Lead CRA archives:

Wednesday, July 9, 2008

Close-Out Visits

I've done about 10 close-out visits in the last few months so it feels like a good time to write a short article explaining what the objectives of these visits are and how a typical close-out visit (COV) is conducted.

A COV will occur once subjects are no longer being dosed, all the data have been collected (there are no more outstanding AEs/SAEs & all outstanding Queries/data clarification forms have been resolved appropriately), the database is locked and ready for statistical analysis, and the study conduct has ended. At this point, the site's contributions are over so the monitor returns for one final visit to shut down the site. The whole concept behind a close-out visit is to ensure that everything is neat and tidy at the study site and that the documentation is well organized and will remain intact and be accessible in the future as needed for regulatory reasons. A sponsor or the FDA should be able to return to the place of study conduct years later and re-create exactly what occurred at all points during the trial by reviewing the regulatory documentation, subject and source documentation, full medical charts, and any other applicable study records. Documentation is everything in our industry and we are always saying, "if it isn't documented it didn't happen." If thorough and accurate records are not maintained, the PI cannot prove that the study was conducted in accordance with the protocol and all applicable regulations and that subject safety was adequately monitored throughout the conduct of the trial.

Site Supplies and Drug Return

We are using tamper evident tape to
box up investigational product for return.
If the tape is lifted it leaves behind an
artifact to show it has been tampered with.
One of your major objectives at the COV will be to assist the site in dealing with any unneeded study materials or supplies. With permission from the sponsor, some of these activities can even take place before the close-out visit as you remotely supervise. The close-out duties will likely include disposing of or retrieving all unused lab or study supplies such as patient handouts, electronic diaries, etc. In most cases, you will have the site generate a file note or similar documentation so there is a record indicating that study supplies were disposed of or moved off-site. 9 times out of 10, the Investigational Product (unused and the used packaging) will need to be inventoried, accounted for in drug logs, and then shipped to a depot or destruction facility. Sometimes the drug will be destroyed on site by a pharmacist or according to the site's SOP but this is really the decision of the sponsor. If you are lucky, you were able to pack up and ship back drug routinely throughout conduct otherwise you will have to deal with it all at the end.


Essential Documents
You will have the PI sign off on any tracking logs that were used during the study. The original will be placed in the site's Regulatory binder but you will retrieve a copy for the Trial Master File. You will ensure that a Subject Identity List was completed and will be kept that lists the contact information for all treated subjects (you will not take a copy of this document as it has private information and stays at the site only). Documents you will take copies of include: Site Visit Log, Subject Screening AND Enrollment Log, Delegation of Authority Log, Proof of Drug Receipt, Subject Specific Investigational Product (IP) Accountability Logs, Copies of temperature/freezer logs, Site Initiation Statement, Training Documentation, Overall Site IP Log, Protocol/Amendment Signature Pages, Any updated 1572s, medical licenses, or CVs, Site communications to the IRB/IEC (ethic committee), and the IRB Final Status Document. Obviously in a study with many safety reports, a long line of routine monitoring visits, multiple site hand-offs/transitions between several different monitors, or a slew of important correspondence, checking that the essential documents binder(s) is in perfect order can be a time-consuming task.

Subject Records
Although you will have already verified this throughout conduct, the close-out visit is your last opportunity to be absolutely sure that the appropriate version of signed and dated Informed Consent Forms are on file for every subject. You will also check that all source is complete (all lab reports and ECGs have been signed and dated with Clinical Significance assessed by the PI/Sub-I) and that all AEs/SAEs have been signed off by the PI/Sub-I and that they were followed to resolution as specified by the protocol. Finally, check that all significant Protocol Deviations (study procedures not conducted according to protocol, enrollment of inappropriate subjects, dosing errors, consenting errors, unblinding, subjects developing withdrawal criteria yet continuing in study, etc.) have been properly recorded and the sponsor/IRB has been notified as appropriate.

PI Responsibilities
Discuss with the PI his/her responsibilities including: query/data collection following the close-out visit, essential document retention, publication rights, and the necessity to update the Financial Disclosure statement if there are changes in their financial interest for up to one year following completion of the study. Finally, explain to the PI the potential for regulatory agency inspection and the requirement that the site notify the CRO/sponsor immediately if contacted for an audit/inspection.

Assuming you have done a thorough job in monitoring throughout conduct, the COV should be a relatively short-visit. Meeting with the PI to discuss their regulatory responsibilities post trial conduct and obtaining required signatures usually takes less than 20 minutes assuming they are an experienced investigator and are already familiar with the GCP schpeel. Drug return often takes several hours but you can prepare most drug return documents in advance of the visit by using sponsor or IVRS reports and usually save a considerable amount of time on-site. You should have been reviewing the regulatory binder at every visit throughout conduct so it should really be in order at this point and stuffed to the brim - I usually budget no more than an hour to ensuring that the binder is complete.

After you complete the close-out visit, you will write a report to the sponsor to let them know that all of the objectives were completed and a follow-up letter to the site thanking them for their participation and informing them that there are no further pending action items. Any new regulatory documentation you copied while on site will need to be forwarded to the Trial Master File so that the sponsor's documentation is a true mirror of what is on site.

You may also like...from The Lead CRA archives:

Sunday, March 16, 2008

Routine Monitoring Visits

Routine or Interim Monitoring visits are basically any visit that occurs after the site is initiated and up until the site is closed out. As monitors, we visit our sites periodically to ensure that they are compliant with all the regulations, subject safety is being adequately followed, data is being captured in a timely and reliable manner, the Investigational Product is being handled as per protocol and relevant regulations/guidelines, there are no significant deviations from the planned study protocol, all important study documentation is being generated and stored properly, and that the research site is adequately supplied in regards to lab kits and other pertinent study materials. The ultimate purpose of our job is to protect subject safety by monitoring the trial conduct for ICH/GCP compliance.

When planning your monitoring visits
it is helpful to have a reasonable expectation
of how think the medical records and source
documents will be. Know in advance how much
you will need to review so you budget enough
time to successfully complete your objectives.
Your agenda from visit to visit may vary slightly based on the length of the study and how many times you plan to visit, the amount of time you spend to plan at the site for this particular visit, the site's progress to date (if a site has yet to enroll any subjects you surely won't have any CRFs to review or pull), and where you are at with the general monitoring plan (for example, drug accountability may be done all along or just at close-out).

Prior to your visit you will contact the site to set up a suitable time for your visit. Visits typically last a day or two. Ideally, the PI would be available to meet with you during the visit. You will send a confirmation letter to the site once a date is set (be sure to confirm the address before you go if you haven't been there before!). More often than not, your study lead will provide you with a monitoring visit checklist or at the very least, a monitoring report template so you will know exactly what tasks you are expected to perform on-site and what topics to cover. Here are some of the specific tasks that are routinely performed at these visits:
  1. Informed Consent Form (ICF) review: You are ensuring that every subject was adequately informed and consented to the study before any study procedures were completed (I recommend checking lab draw times and ECG times - if required at the screening visit - against the consent time to be extra sure that the consent was the first study procedure to occur). There are other state specific regulations you will need to know and monitor for. For example, in some states subjects must be 19 to participate and in California every subject must sign the 'CA Bill of Rights' document, etc. Sometimes there are multiple versions of a consent due to a change in the facility address or the details of the protocol. Ensure that all subjects signed on an IRB approved version (each page will be stamped in the upper right hand corner and the version date will be printed on each page). Proper consenting of subjects is critical to ensure the security and privacy of health data and that subjects are adequately informed of the study procedures, risks and, benefits. If the consent is not signed or properly completed inform the Study Coordinator and do not review this subject's medical chart until consent has been properly obtained.
  2. Check for Serious Adverse Events (SAEs): Per the guidelines, an SAE is any untoward event that results in death, prolonged or new hospitalization (longer than 24hrs), significant disability, or congenital anomaly (birth defect). If the event has not been reported, assist the Study Coordinator in doing so and inform the sponsor immediately.
  3. Review Protocol Compliance: In your chart and source document review, you can verify that subjects were sign at the right times and the right procedures were conducted as per the protocol. You will have study-specific procedures for reporting deviations. Deviations of a serious nature may be reported in an expedited manner and may need to go to the IRB (dosing errors, unblinding of study treatment, subject enrolled that did not satisfy entry criteria, etc.)
  4. Compare source documents to Case Report Forms: You are checking that the data in the chart matches the Case Report Forms (which will be later entered into the clinical database and combined with other subject's data to complete the safety and efficacy analysis for the Investigational Product). Determine whether or not CRFS being completed in a timely manner. You also want to verify that the source is complete, neat (all corrections must be compliant with the regulations - white-out is not OK), attributable (who wrote it? Is it initialed and dated), contemporaneous (was it written at the time the procedure was completed?), valid (is the data collected even possible?), etc. Sometimes you will be asked to pull the case report forms and send them in to data management and other times they will stay at the site until the end of the study.
  5. Review Investigational Product (IP): The study protocol will explain how the IP is to be stored, dispensed, and returned. Verify that all of this occurred properly by reviewing temperature logs, storage facilities, administration records, IVRS entries/reports for subject-specific IP accountability, and speaking to the relevant personnel.
  6. Regulatory Binder / Essential Documents Review: Determine if any forms need to be updated or pulled for the Trial Master File (TMF). The TMF is meant to be an exact replica of all the documentation at the site. Specific information regarding the contents of the essential documents binder are covered in section 8 of the guidelines.
  7. Confirm Site Adequacy / Site Status: Determine if there are new staff at the site or if staff have left. Can the site manage with current staff? Has the site or the lab moved? Confirm that there are adequate study supplies
  8. Study-Specific Monitoring Tasks: Depending on the protocol, you may need to perform additional tasks such as shipping materials back to headquarters (for example lab specimens, xrays, etc.), calibrating or reviewing calibrations of equipment, site training, checking eDiary compliance, etc.
  9. Review Ongoing or Pending Issues from Previous Visits: At some point during every visit work with the staff to resolve any items identified at previous visits as ongoing issues. Indicate in your report once these are resolved.
  10. Review of findings with the site: Whether or not you find issues during your visit, keep the site staff posted on your progress and how things are going. Especially, if the Principal Investigator is not available during the visit, be sure to summarize everything accurately and completely in your follow-up letter.
Try to schedule your next (or next several) visits before you leave the site. After the visit, write your report and send the follow-up letter within a week or per your monitoring plan and refer to your company's SOPs. Always report significant compliance issues to your management, the sponsor, IRB, and QA as appropriate. Remember that you must document everything because of the adage, "if it isn't documented, it didn't happen". Please contact me if I can elaborate on anything or if you think I've left something important out.